Does generator installation require a permit?

Yes, installing a permanent standby generator always required a permit for the electrical connections and another permit for the fuel connection. We pull our own electrical permit and call for our own inspections after the work is complete. Fuel permits are acquired by the fuel provider but we can also provide a turnkey solution to work directly with your fuel provider at an additional cost and manage their installation as well.